Mechanimous

Animated Systems

PAGE SRC AI-generated visuals

Use cases

All use cases
Metal WorkshopConcept

Keep the right drawing with the job

As a job passes between people, drawing revisions, dimensions and inspection notes can lose their connection.

A shared job record would show approved specifications, unresolved conflicts, the next step and who is responsible.

How it would work

  1. Capture the enquiry and request missing measurements.
  2. Attach approved drawings and flag conflicting versions.
  3. Track the work; have a responsible person confirm inspection and handover.

Example

Invented input and draft, not a software result.

Input

Two notes specify widths of 600 mm and 640 mm; neither points to an approved drawing.

Draft

The widths conflict. Confirm the approved specification before preparing production work.

People & limits

Qualified people approve specifications, machining and inspection.

  • Photos cannot establish missing dimensions or materials. The newest file is not necessarily approved.
  • No machine or safety-system control.

Concept only; not implemented or validated.